• Sevan
  • Sevan
  • Sevan
 
 
Hummingbird Spirit

080928_hummingbird offloading_lowIn August 2008, Hummingbird Spirit became the first cylindrical FPSO to be installed in the North Sea. Actual measurements from the unit during, confirmed performance in ­accordance with model tests and theoretical analysis. In addition, the ability to take delivery of helicopters even during severe winter storms and no processing restrictions experienced in relation to weather conditions, have additionally demonstrated the suitability of the Sevan design for operations in harsh environments.

Hummingbird Spirit has continued to deliver stable operation and production, with a yearly average Technical Uptime of 97.4% for 2009. By the end 2009, a total of 20 cargoes and app 4.5 millions bbls of oil had been offloaded from the unit. 310 days without lost time incidents was noted at the end of the year.

Hummingbird Spirit has been operating under a 2.5+4*0.5+3*1+ 2*1 year charter contract for Centrica Energy Upstream. Centrica is an integrated energy company operating predominately in the UK and North America. Upstream, the company source, generate, process, trade and store energy. Downstream, the company supply gas and electricity to millions of homes and businesses and offer a distinctive range of home energy solutions and low-carbon products and services.

 

 

 

Key Data:

Design: Sevan 300
Building year: 2006-2007
Yards: Yantai Raffels (hull)
Keppel Verolme (topside integration)
Owner: Teekay Petrojarl AS
Client: Centrica Energy Upstream
Contract: 2.5 years fixed + options
Field: Chestnut, Central UK sector North Sea
Water depth: 120 m
Field application: Oil production and water injection
Production startup: September 2008

Techical data:

Overall length: 66 m
Diam. in waterline: 60 m
Displacement at 18m draft: 55,000 mT
Deck area capacity: 5,000 mT
Deck area: 3,200 m2
Accommodation: 44 persons
Mooring: 12 lines
(anchor-chain-polyester-chain)
Riser slots: 10
Liquid production: 30,000 bbl/day
Crude storage
capacity:
270,000 bbls/43,000 m3
Export to
shuttle tanker:
3,600 m3/h

Images

0803_humminbird 080928_hummingbird offloading
Hummingbird Spirit on the Chestnut field
Photo: BERR
Offloading from Sevan Spirit
  Download high-res picture 1.25 Mb  Download high-res picture  

 
 
 
© 2013 Sevan Marine ASA  • Kittelsbuktveien 5, 4836 Arendal, Norway  •  Phone: +47 37 40 40 00 •  E-mail: post@sevanmarine.com